Site Logo
My Account | Wishlist | Basket
All Categories
Barbecue Accessories

Barbecue Motors

See More
IONQXIDLD
Barbecue Accessories - Barbecue Motors

  1. Home
  2. Barbecue Accessories
  3. Barbecue Motors
Product Image

IONQXIDLD Nema17 stepper motor with T8 lead screw 4 mm 100-300 mm 42 motor 17HS3401S for Z axis long lead screw(17HS3401S-T8x4-300mm)

£72.62

Product Reviews

Name: Review:

Related Products

IONQXIDLD Nema17 stepper motor 12v 17HS4401S 1.8 degree 42 high torque motor 40N.CM 1.5A stepper angle motor

IONQXIDLD Nema17 stepper motor 12v 17HS4401S 1.8 degree 42 high torque motor 40N.CM 1.5A stepper angle motor

£47.60

IONQXIDLD NEMA17 Stepper Motor 1.5A 40N.CM 17HS4401S-SZ 42 Torque Motor 12v 4 Lead Dual Axis Stepper Motor

IONQXIDLD NEMA17 Stepper Motor 1.5A 40N.CM 17HS4401S-SZ 42 Torque Motor 12v 4 Lead Dual Axis Stepper Motor

£49.52

IONQXIDLD Nema17 Stepper Motor 48mm Stepper Motor 42BYGH 2A 4 Lead 17HS8401S-1MD Motor

IONQXIDLD Nema17 Stepper Motor 48mm Stepper Motor 42BYGH 2A 4 Lead 17HS8401S-1MD Motor

£63.25

IONQXIDLD Nema17 Stepper Motor 20mm 1A 16N.cm 42 Short Stepper Motor 4 Leads 17HS08-1004S

IONQXIDLD Nema17 Stepper Motor 20mm 1A 16N.cm 42 Short Stepper Motor 4 Leads 17HS08-1004S

£36.88

IONQXIDLD Nema17 Stepper Motor 20mm 1A 16N.cm 42 Short Stepper Motor 4 Leads 17HS08-1004S

IONQXIDLD Nema17 Stepper Motor 20mm 1A 16N.cm 42 Short Stepper Motor 4 Leads 17HS08-1004S

£50.05

IONQXIDLD Nema17 stepper motor, screw lead 8 mm 1.3A 28N.CM 34 mm 17HS3401S-T8*8 300 mm Z-axis screw stepper motor(3401S-T8x8-300mm)

IONQXIDLD Nema17 stepper motor, screw lead 8 mm 1.3A 28N.CM 34 mm 17HS3401S-T8*8 300 mm Z-axis screw stepper motor(3401S-T8x8-300mm)

£69.03

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyBarbecue.co.uk 2026